一、窗台梁工序普遍倒置(先砌墙后浇筑,留有缝隙)、且无排水坡度,渗漏隐患
![1.jpg](http://img.ytfsxh.com/d/file/zhishi/gcgl/2019-12-23/a8c5eaf718766e46245ef3221f20a61d.jpg)
优秀做法:窗台梁、腰梁浇筑完毕达到强度要求后方可进行后续砌筑
![2.jpg](http://img.ytfsxh.com/d/file/zhishi/gcgl/2019-12-23/853f025b0068a009872f45c2c6223422.jpg)
优秀做法:构造柱立模时在柱顶与梁板交接处设喇叭口,一次性浇筑,保证柱顶混凝土浇筑密实,后期混凝土强度满足要求后剔除
![3.jpg](http://img.ytfsxh.com/d/file/zhishi/gcgl/2019-12-23/90a915a62e41281568e9e85920ffb273.jpg)
二、局部外墙未满刀灰,有渗漏隐患
![4.jpg](http://img.ytfsxh.com/d/file/zhishi/gcgl/2019-12-23/6d89a5f06a52cd379b67b58d701c7265.jpg)
优秀做法:外墙必须满刀灰
![5.jpg](http://img.ytfsxh.com/d/file/zhishi/gcgl/2019-12-23/04f4a507aeed55f562111140a56f7cc5.jpg)
三、断砖上墙现象仍有不少
![6.jpg](http://img.ytfsxh.com/d/file/zhishi/gcgl/2019-12-23/95b82d3b8f4874b4af5f1e11b019f50c.jpg)
优秀做法:砌块上墙前应进行挑选,断砖需锯切后方可上墙
![7.jpg](http://img.ytfsxh.com/d/file/zhishi/gcgl/2019-12-23/d258704f680e13ed593db04863167b8d.jpg)
四、窗台梁处用水泥砖找模数,且未满刀灰,有渗漏隐患,砌筑前提前算好皮数划线,砌筑时挂皮数杆
![8.jpg](http://img.ytfsxh.com/d/file/zhishi/gcgl/2019-12-23/d6ff72d27dd86010e6ec4a8a04913c74.jpg)
五、构造柱植筋不匹配,未与主筋有效绑扎且植筋外露长度必须满足搭接要求(马牙槎内砌筑砂浆随手清理干净)
![9.jpg](http://img.ytfsxh.com/d/file/zhishi/gcgl/2019-12-23/99842cb70d9c7602f743c7567b19efce.jpg)
六、空调孔外高内低,后续渗漏隐患
![10.jpg](http://img.ytfsxh.com/d/file/zhishi/gcgl/2019-12-23/3a81d973ee30ed2cbd3ce0cb1b03ea9c.jpg)
七、部分墙体平整度、垂直度不达标
![11.jpg](http://img.ytfsxh.com/d/file/zhishi/gcgl/2019-12-23/cbf146cd2d13d8b54b501ff0c54cffb0.jpg)
优秀做法:技术交底明确标注砌体垂直度,正手墙5,反手墙8;平整度正手墙10,反手墙15
![12.jpg](http://img.ytfsxh.com/d/file/zhishi/gcgl/2019-12-23/19ff245325ac347c6e1bce1ebecb5d7e.jpg)
八、部分分户墙未用页岩砖砌筑且混砌
![13.jpg](http://img.ytfsxh.com/d/file/zhishi/gcgl/2019-12-23/f68e121db6cddd9da1c8c5b0b3c7a901.jpg)
优秀做法:分户墙必须严格按照交底用页岩砖砌筑,且不容许混砌
![14.jpg](http://img.ytfsxh.com/d/file/zhishi/gcgl/2019-12-23/d19ffa2cc77e3ab6b2fd2cffb31a5ae8.jpg)
九、止水坎浇筑前垃圾清理不到位,有渗漏隐患
![15.jpg](http://img.ytfsxh.com/d/file/zhishi/gcgl/2019-12-23/f1d842919540cb7340527726309dec13.jpg)
优秀做法:厨卫以及外墙止水坎支模前基层必须清理、凿毛、湿润,且及时报验质检验收合格后方可浇筑
![16.jpg](http://img.ytfsxh.com/d/file/zhishi/gcgl/2019-12-23/bcad9f77ff147b0f2e1ac1b4cca1cd50.jpg)
十、植筋深度控制不严,已造成顶板渗漏
![17.jpg](http://img.ytfsxh.com/d/file/zhishi/gcgl/2019-12-23/5ff7b8a8cfb7e877d69b5a6de3c81e03.jpg)
优秀做法:强化植筋现场交底,植筋深度、位置、严格按照交底执行
![18.jpg](http://img.ytfsxh.com/d/file/zhishi/gcgl/2019-12-23/a8466cfe5e9945f7ef2d4205284e2fa9.jpg)
十一、二次结构模板脱模剂随意洒落楼面,为后期做地坪留有地面空鼓隐患
![19.jpg](http://img.ytfsxh.com/d/file/zhishi/gcgl/2019-12-23/84ad59a2fd0f420b1f94f532b3d69aeb.jpg)
优秀做法:脱模剂用量控制好,不可污染楼面、钢筋等,保证工完场清,落地灰清理回收利用
![20.jpg](http://img.ytfsxh.com/d/file/zhishi/gcgl/2019-12-23/c1892436207190706f67160c24c22478.jpg)
十二、塞砖不密实,责任心差
![21.jpg](http://img.ytfsxh.com/d/file/zhishi/gcgl/2019-12-23/03871f99042ede3f0920310b5fb1a63f.jpg)
优秀做法:塞砖严格按照本工程交底间隔15天,必须密实,遇安装管线留置后期封堵
![22.jpg](http://img.ytfsxh.com/d/file/zhishi/gcgl/2019-12-23/f3a243e5d4e41a2980fd2bec2ce50fbc.jpg)
十三、灰缝控制不严,观感差
![23.jpg](http://img.ytfsxh.com/d/file/zhishi/gcgl/2019-12-23/bb0e2d11a94eb7d1fa416add98b62717.jpg)
优秀做法:砖砌体灰缝控制8-12mm,加气块15mm
![24.jpg](http://img.ytfsxh.com/d/file/zhishi/gcgl/2019-12-23/eff4adbdc0b8bfa03b413a60d7924ed2.jpg)
十四、窗台梁模板长度不够且混凝土收面不平(窗台梁一定要找出结构坡度)
![25.jpg](http://img.ytfsxh.com/d/file/zhishi/gcgl/2019-12-23/556c77c7113ff54f41387184b1dc22e9.jpg)
优秀做法:加强现场督察,责任到人
![26.jpg](http://img.ytfsxh.com/d/file/zhishi/gcgl/2019-12-23/0fdc4310ad377f2ee3a8982936886245.jpg)
十五、墙体开槽前未弹线,导致边角不顺直,观感差
![27.jpg](http://img.ytfsxh.com/d/file/zhishi/gcgl/2019-12-23/32782f759ac5192dde8c48c75b2c9d21.jpg)
优秀做法:开槽前必须先弹线,且开槽深度严格按交底执行
![28.jpg](http://img.ytfsxh.com/d/file/zhishi/gcgl/2019-12-23/1e412dec2b06f8154def845e55cb677a.jpg)
十六、马牙槎浇筑观感差,漏浆严重污染墙面:构造柱封模前海绵条必须张贴到位,否则漏浆严重影响观感
![29.jpg](http://img.ytfsxh.com/d/file/zhishi/gcgl/2019-12-23/87b45a9b71fc3a509c80c6efbe0873d1.jpg)